SECTION-A
Q1. Fill in the Blanks 15×1=15
I) There should be ___________ visibility at the air pot site.
II) A plant used to prepare premix carpet is _____________
III) NHAI is working under the guidance of _______________
IV) Crushed rock is a __________ road aggregate.
V) Joint are provided to prevent _____________ in concrete pavement.
VI) Methods to control soil erosion are ___________________
VII) Mud pumping occurs in _____________ Road.
VIII) ____________ Pavement can be laid directly over sub grade.
IX) Salient curve are ___________ Dangerous then re-entrant cures.
X) The hardness of road aggregate is tested by _______________
XI) Minimum shoulder width recommend by IRC ________________
XII) The cross slope provide to road surface is __________________
XIII) The wave like deformations is known as ______________
XIV) The water can enter the pavement structure from top sides and _______
XV) All roads after construction require periodic _______________
SECTION-B
Q2. Attempt any five questions. 5×6=30
a. What is the necessity of airport engineering?
b. What do you mean by highway machinery? Name the important tools and plant used.
c. Write short note on cross drainage works in hill road.
d. Write common causes of failure in flexible pavement.
e. What are the factors affecting road alignment?
f. Define stopping sight distance and passing sight distance.
g. Write the importance of CBR test.
h. Write a short note on hangers and taxiways.
SECTION-C
Q3. Attempt any three questions. 3×10=30
Q3. What is soil stabilization? What are the different methods of soil stabilization?
Q4. Write short note on:
a) Super elevation
b) Road estimates
Q5. Define landslide? Explain the causes of landslides and methods to prevent these.
Q6. Explain the construction steps for laying concrete roads.
Q7. Write short notes on:
a) Catch water drains.
b) Mud pumping.
Get Started
There should be ___________ visibility at the air pot site.
A plant used to prepare premix carpet is _____________
NHAI is working under the guidance of _______________
Crushed rock is a __________ road aggregate.
Joint are provided to prevent _____________ in concrete pavement.
Methods to control soil erosion are ___________________
Mud pumping occurs in _____________ Road.
____________ Pavement can be laid directly over sub grade.
Salient curve are ___________ Dangerous then re-entrant cures.
The hardness of road aggregate is tested by _______________
Minimum shoulder width recommend by IRC ________________
The cross slope provide to road surface is __________________
The wave like deformations is known as ______________
The water can enter the pavement structure from top sides and _______________
All roads after construction require periodic _______________Highway Engineering HE 5th Sem/Civil/May 2017 Diploma PSBTE Paper Click Here
Explain the softening point test of bitumen. Write its significance.a. What is the necessity of airport engineering?
b. What do you mean by highway machinery? Name the important tools and plant used.
c. Write short note on cross drainage works in hill road.
d. Write common causes of failure in flexible pavement.
e. What are the factors affecting road alignment?
f. Define stopping sight distance and passing sight distance.
g. Write the importance of CBR test.
h. Write a short note on hangers and taxiways.
Write a short note on taxiway.Short note on taxiway.
What do you mean by gradient? Explain the various types of gradient.Gradient and various types of gradient.
Give the functions of IRC.Functions of IRC.
Compare bitumen and tar.Compare bitumen and tar.
Explain the CBR test for soil.CBR test for soil.
What are the causes of landslides?Causes of landslides
Explain terms borrow pits and spoil banks.Borrow pits and spoil banks.
What do you mean by road pavement and explain its types.Road pavement and its types.
Highway Engineering HE 5th Sem/Civil/May 2017 Diploma PSBTE Paper Click Here
Highway Engineering HE 5th Sem/Civil/
May 2017 Diploma PSBTE Paper
Get Started
https://www.youtube.com/watch?v=UHX6f8TIvX8https://www.youtube.com/watch?v=M_RR6LVICp0https://www.youtube.com/watch?v=mV41CMWonN4https://www.youtube.com/watch?v=s0LVPE0Q3LE&list=PLA9Q9SDZ781WXNAWit379A4CRLMvjGiUw&index=14&t=0s
What is soil stabilization? What are the different methods of soil stabilization?Soil stabilization and different methods of soil stabilization
Write short note on: a) Super elevation b) Road estimatesShort note on:
a) Super elevation
b) Road estimates
Define landslide? Explain the causes of landslides and methods to prevent these.Landslide and causes of landslides and methods to prevent these.
Explain the construction steps for laying concrete roads.Construction steps for laying concrete roads.
Write short notes on: a) Catch water drains. b) Mud pumping.Short notes on:
a) Catch water drains.
b) Mud pumping.
MY YOUTUBE CHANNEL
JK Smart Classes Upload Lecture for Degree classes like B.TECH,M.TECH in any stream like ECE,EE,ME and Civil Engineering

JK SMART CLASSES
ER.JASWINDER KUMAR

JK SMART LECTURE
ER.JASWINDER KUMAR
Engineering Classes Upload Lecture for Polytechnic Diploma classes in any stream like ECE,EE,ME and Civil Engineering

ENGINEERING CLASSES
ER.JASWINDER KUMAR

er.jaswinder kumar
Senior Lecturer