79

Download Previous Year Diploma Paper of Highway Engineering HE 5th Sem/Civil/Dec 2015 Paper

Highway Engineering HE 5th Sem/Civil/Dec 2015 Diploma  PSBTE Paper

                                                SECTION-A

Q1. Fill in the Blanks                                                      15×1=15

     I) The gentleman who looks after the design, construction and maintenance of roads is called ____________
    II) Carriage way and shoulders combined together is known as ________
   III) Road should always cross at _____ if it comes across stream or railway line.
   IV) The compacted soil which acts as a base to support road pavement is called         _______
   V) Cements concrete roads are examples of pavements.
   VI) The stone wall constructed to protect the hill slope is __________
  VII) Road side development is termed as ___________
  VIII) Topographic maps are prepared by the department of ______________
    IX) The points which control the road alignment are called ________________
     X) The solution of bitumen in a solvent is called ______________

State True or False:-                                                                             

    XI) Road drainage is not essential aspect of highway engineering.
   XII) The formation of pot holes is due to inadequate wearing course provide.
  XIII) Concrete road paver is used for flexible pavements.
  XIV) The first modern aeroplane was invented by weight brothers.
   XV) The width of carriageway recommended for two lane payment is 3.75 m.

                                      SECTION-B

Q2. Attempt any Six questions.                                                                    6×5=30

     1. State IRC classification of roads.
     2. Define camber. Why it is provided? What are the disadvantages of heavy                  camber?
     3. Write a sort note a super-elevation.
     4. What is the difference between tar and bitumen?
     5. What are different causes of failure of bitumen roads?
     6. Define landslide give its causes how will you prevents it.
     7. State the briefly function of I.R.C.
     8. What is road drainage? What is its necessity?
     9. Define road maintenance. Give its necessity.

                                     SECTION-C

Q3. Attempt any three questions.                                                       3×10=30

   Q3 What is Subgrade soil. What is its function? Explain CBR test to evaluate the strength of soil subgrade.
   Q4 What do you mean by road pavement. What are the different types of road pavements? State the merits and demerits of flexible and rigid pavements.
   Q5 What is soil stabilization? What are the different methods of soil stabilization?
   Q6 What are WBM roads? State their advantage and disadvantage. Describe the various steps involved in the construction of WBM roads.
   Q7 Define soil erosion. What are the important methods to control soil erosion?

Highway Engineer ing HE 5th Sem/Civil /May 2019 Diploma  PSBTE Paper

Get Started

Section a Highway Engineering HE 5th Sem/Civil/DEC 2015 Paper

The gentleman who looks after the design, construction and maintenance of roads is called ____________ Carriage way and shoulders combined together is known as ____________ Road should always cross at _____ if it comes across stream or railway line. The compacted soil which acts as a base to support road pavement is called   _______ The solution of bitumen in solvent is called  ______________  Cements concrete roads are examples of  ______ pavements. The stone wall constructed to protect the hill slope is __________ Road side development is termed as ___________ Topographic maps are prepared by the department of ______________ The points which control the road alignment are called ______________ The solution of bitumen in a solvent is called ______________ Road drainage is not essential aspect of highway engineering.T/F The formation of pot holes is due to inadequate wearing course provide.T/F Concrete road paver is used for flexible pavements.T/F The first modern aeroplane was invented by weight brothers.T/F The width of carriageway recommended for two lane payment is 3.75 m.T/F

 

Highway Engineering HE 5th Sem/Civil/May 2019 Diploma  PSBTE Paper Click Here

Section B :Highway Engineering HE 5th Sem/Civil/dec 2015 Paper

State IRC classification of roads.

IRC classification of roads.

Define camber. Why it is provided? What are the disadvantages of heavy camber?

Camber. Why it is provided and  disadvantages of heavy camber

Write a short note a super-elevation.

Short note a super-elevation.

What is the difference between tar and bitumen?

Difference between tar and bitumen

What are different causes of failure of bitumen roads?

Causes of failure of bitumen roads

Define landslide give its causes how will you prevents it.

Landslide give its causes how will you prevents it.

 State the briefly function of I.R.C.

Function of I.R.C.

What is road drainage? What is its necessity?

Road drainage and  its necessity

Define road maintenance. Give its necessity.

Road maintenance and  its necessity.

Highway Engineering HE 5th Sem/Civil/DEC 2015 Diploma PSBTE Paper Click Here

Highway Engineering HE 5th Sem/Civil/ dec 2015 Diploma  PSBTE Paper

Get Started https://www.youtube.com/watch?v=UHX6f8TIvX8https://www.youtube.com/watch?v=M_RR6LVICp0https://www.youtube.com/watch?v=mV41CMWonN4https://www.youtube.com/watch?v=s0LVPE0Q3LE&list=PLA9Q9SDZ781WXNAWit379A4CRLMvjGiUw&index=14&t=0s

Section c :-Highway Engineering HE 5th Sem/Civil/dec 2015 Diploma  PSBTE Paper

What is Subgrade soil. What is its function? Explain CBR test to evaluate the strength of soil subgrade.

Subgrade soil and its function

Explain CBR test to evaluate the strength of soil subgrade.
   

What do you mean by road pavement. What are the different types of road pavements? State the merits and demerits of flexible and rigid pavements.

Road pavement and different types of road pavements

Merits and demerits of flexible and rigid pavements.
   

What is soil stabilization? What are the different methods of soil stabilization?

Soil stabilization and different methods of soil stabilization
   

What are WBM roads? State their advantage and disadvantage. Describe the various steps involved in the construction of WBM roads.

WBM roads and its advantage and disadvantage. 

Steps involved in the construction of WBM roads.
   

Define soil erosion. What are the important methods to control soil erosion?

Soil erosion and important methods to control soil erosion

Soil and Foundation Engineering 5th Semester /Civil/Dec 2015 Paper Contact Us
MY YOUTUBE CHANNEL
JK Smart Classes Upload Lecture for Degree classes like B.TECH,M.TECH in any stream like ECE,EE,ME and Civil Engineering \"JK JK SMART CLASSES ER.JASWINDER KUMAR \"JK JK SMART LECTURE ER.JASWINDER KUMAR Engineering Classes Upload Lecture for Polytechnic Diploma classes in any stream like ECE,EE,ME and Civil Engineering \"JK ENGINEERING CLASSES ER.JASWINDER KUMAR \"JK er.jaswinder kumar Senior Lecturer
Scroll to Top